RXL (ROX RESOURCES LIMITED) 2010-03-15:
Rox Resources announced a revised resource estimate based on results from recent drilling at its Myrtle zinc-lead project 20km south of the McArthur River mine in the Northern Territory. The revised resource contains 13% in the Indicated category and represents an 18.5% increase in tonnes and 14.7% increase in contained metal over the previous estimate. The resource is still open to the north and west and at a lower cut-off of 3% Zn+Pb is 43.6Mt @ 4.09% Zn, 0.95% Pb, for 5.03% Zn+Pb. The resource contains 2.193Mt combined insitu zinc and lead metal, comprising 1.78Mt Zn and 412,000t Pb.
Daily stock scan reports on Australia Stock Exchange (ASX).
Resource stock updates and drilling results.
Scan the market for: Daily break out alerts, Top stock lists.
Stock pick is so easy from our blog posts.
Tuesday, March 16, 2010
Resource stock updates
ASX resource company drilling updates - more on http://www.sharefilter.com
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment